Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD Drilling Rig / Drill Rod / Drill Bit / Track Transporter / Drilling Mud Pump

Manufacturer from China
Verified Supplier
7 Years
Home / Products / Soil Test Drilling Machine /

150m Depth Tractor Mounted Water Well Drilling Rig Hydraulic Control System

Contact Now
Jinzhou City Shitan Machinery Equipment CO. LTD.
Visit Website
City:jinzhou
Province/State:hebei
Country/Region:china
Contact Person:MsAnna
Contact Now

150m Depth Tractor Mounted Water Well Drilling Rig Hydraulic Control System

Ask Latest Price
Video Channel
Brand Name :JINZHOU SHITAN
Model Number :ST-200
Certification :ISO9001
Place of Origin :China
MOQ :1 set
Price :Negotiation
Payment Terms :L/C, D/A, D/P, T/T, Western Union
Supply Ability :2000 sets per year
Delivery Time :7-12 days
Packaging Details :Standard Export Package
Type :Core Drilling Rig
Power Type :Diesel
Usage :Water Well
Voltage :220v/380v
Power(W) :22kw
Weight :880Kg
Name :Soil Testing Drilling Rig
Drill Depth :200m
Engine :Diesel or Electric Motor
Application :Core Sampling, Water Well
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

150m Depth Tractor Mounted Water Well Drilling Rig/Core Drilling Machine

Drilling rig product introduction

series hydraulic drilling rig is a kind od widely used portable drill machine. It is suitable for drilling water well, geological survey, geological core drilling, small grouting holes, lasting holes of railway, water conservancy, bridges, dam foundation and other bulidings, According to different strata, it drills by choosing different bits, suh as, diamond composite films and alloy.

.Product Parameter:

Drilling depth 230m
Maximum borehole caliber 300mm
Minimum borehole caliber 75mm
Diameter of Drill pipe 42/50/60mm
Drilling angle 90°~75°
Weight(Not include power) 1150kg
Unity machine dimension 2750*950*1770mm
2.Vertical Spindle
Spindle rotating speed 64/128/287/557r/min
Spindle stroke 450mm
3.Hoist
Max. single line lifting capacity 2400kg
Reel lifting speed 1.64m/s
Steel wire rope diameter 13mm
Steel wire rope capacity 35m
Hug floodgate diameter 245mm
Hug floodgate belt width 70mm
Movable distance 400mm
4. Mud pump
Type GS-200
Type Horizontal Single Cylinder with double function
Max. Discharge Diesel engine 170L/min
Electrical Motor 140L/min
Max. Pressure 3MPa
Work Pressure 1.5MPa
5. Power
Diesel engine 22HP
Electric Motor 15KW
6. Drilling tower
Type Integrated on drilling rig
Control system Hydraulic
7. Trailer chassis
Type 4 wheels

Product Feature:

1. Very powerful at soil, sand, hard rock, etc. land condition.

2. Three kinds drill bits (three-wing bit, alloy bit and diamond bit) available for your choice, which can drill

both soft and hard ground, especially diamond drill bit effective in drilling hard rocks.

3. Hydraulic control system for greatly improving the working efficiency, saving labor force.

4. Mounted wheel or trailer, can be hauled easily by car or tractor, convenient to transport.

5. Power can be diesel engine or electric motor, as per your request.

Precautions during operation of water well drilling rig:


1. Before drilling, the drilling rig shall be constructed in strict accordance with the hole location, orientation, angle and depth
2. Ensure that the drill pipe is not blocked, bent or cracked when installing it.
3. When clean water drilling is adopted, water supply is not allowed before spudding, and pressure drilling can only be carried out after the water returns. Sufficient flow shall be ensured, and dry drilling is not allowed. When there is much rock powder in the hole, water shall be increased to extend the pumping time, and drilling can only be stopped after the hole is effectively flushed.
4. During drilling, the distance shall be measured accurately. Generally, the drill pipe must be measured every 10m of drilling or when the drilling tool is changed, and the hole depth shall be verified and relevant records shall be made. 5. Check the gearbox, shaft sleeve, horizontal and vertical shaft gear, etc. for overheating and abnormal sound. If any problem is found, stop the machine immediately to find out the cause and deal with it in a timely manner. Don't leave the problem unsolved. As a result, mechanical damage is very fast and maintenance costs are high over the years.

150m Depth Tractor Mounted Water Well Drilling Rig Hydraulic Control System150m Depth Tractor Mounted Water Well Drilling Rig Hydraulic Control System150m Depth Tractor Mounted Water Well Drilling Rig Hydraulic Control System150m Depth Tractor Mounted Water Well Drilling Rig Hydraulic Control System

Inquiry Cart 0