
Add to Cart
ST 260 Meters Large Pneumatic Water Well Drilling Rig
ST 260 Water Well Drilling Rig Introduction
ST-260 Water Well Drilling multifunctional hydraulic well drilling rig series mainly applied to industrial and civil drilling and geotemperature drilling. It has the advantages of large diameter of drilling hole, deep drilling, fast footage, and high efficiency.
ST 260 Water Well Drilling Rig Parameters
Drilling Depth | 260m |
Dia.hole | φ105-260mm |
Advance Length one time | 6.6m |
Working pressure | 1.7-3.0MPa |
Air consumption | 17-35m³/min |
Length of rod | 1.5m,2m,3m,6m |
Dia. Of rod | φ76, φ89,φ102,φ114 |
Lifting power | 24T |
Rotation torque | 8500-11000N.m |
Rotation Speed | 40-70r/min |
Diesel Engine | Yuchai |
Engine Power | 85Kw/2200rpm |
Travelling speed | 0-2.5 Km/h |
Climb capacity | 30° |
Weight | 9000kgs |
Dimension | 5900x2000x2850mm |
Application | Complicated geological conditions:Rock,Mud,Sand etc. |
Drilling Way | Top drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling |
Dth Hammer | 4",5",6",8" Drill hammer or CIR110, 130, 150,170 |
ST 260 Water Well Drilling Rig Features
The drill machine adopts new hydraulic technology, supporting high torque hydraulic motor rotation and big bore drill hydraulic propulsion, branded multi-cylinder engine-powered two-stage air filter and the intake air compressor designed for hydraulic systems, extend the life of diesel engines. Unique pump design to facilitate maintenance, reduce maintenance costs. Centralized hydraulic control console, easy to operate.
ST 260 Meters Water Well Drilling Rig FAQ
Q: Are you original manufacturer? A:Yes, we are a manufacturer in construction machinery and we have the whole series products
Q: What kind terms of payment can be accepted? A:Normally we can work on T/T.
Q: What about the delivery time? A:7 days after receiving the deposit.
Q: What about the warranty time? A:12 months after shipment,engine is 6 months.
Q: What about the Minimum Order Quantity? A:The MOQ is 1 set.
Q: Could you stick customers brand on the products? A: We warmly welcome the OEM orders.
Courtyard drilling Attentions
1. Consider whether the well depth is reasonable
We should first investigate whether there are cables, sewers and other facilities under the ground, and avoid unnecessary damage.
2. Convenience, health and other issues should be considered.
After drilling the well, find some charcoal and throw it into the well with a bag and press it at the bottom of the well to absorb foreign toxins. After having water, you can put a few small fish down, which is a good way to test the safety of water quality.
3. The well should not be too deep. It should be above the ground and should be blocked with bricks and stones. It is better to have a cover, so as to prevent dirt from falling in, make people feel safer and avoid unnecessary dangers.
ST 260 Water Well Drilling Rig Display