Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD Drilling Rig / Drill Rod / Drill Bit / Track Transporter / Drilling Mud Pump

Manufacturer from China
Verified Supplier
8 Years
Home / Products / Geological Drilling Rig Machine /

GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth

Contact Now
Jinzhou City Shitan Machinery Equipment CO. LTD.
Visit Website
City:jinzhou
Province/State:hebei
Country/Region:china
Contact Person:MsAnna
Contact Now

GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth

Ask Latest Price
Video Channel
Brand Name :ShiTan
Model Number :GK-200
Certification :ISO9001
Place of Origin :China
MOQ :Negotiation
Price :Negotiation
Payment Terms :T/T, Western Union
Supply Ability :2000Set/Year
Delivery Time :Within 7-12 days
Packaging Details :Standard export transportation package
Production Name :GK 200 Geological Drilling Rig
Model :GK-200
Drilling Depth :200 meters
Drilling Hole Diameter :Customized
Power :Diesel Engine
Application :Engineering ,Coring and Sampling
Voltage :220v
Weight :600kg
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

200 Meters Drilling Depth Mining Exploration Geological Drilling Rig Machine

GK 200 Geological Drilling Rig Introduction

The drilling rig is suitable for engineering geological survey of buildings such as civil engineering, railways, hydropower, transportation, bridges, dam foundations, etc.; geological core drilling and physical exploration; small grouting holes, geothermal holes, blasting holes, drilling of various concrete detecting holes Advance; small well drilling, small pile hole.

GK 200 Geological Drilling Rig Tech Parameter
Drilling Rig Product Model
Drilling diameter(mm) 75,91,110,130,150,300
Drilling depth (m) 200,150,100,70,50,30
Drill pipe diameter (mm) 42,50
Drilling angle(°) 90~75
Equipment size(L * B * H) 1730 * 860 * 1360 (mm)
Rig weight (except engine) 700
Mobile device
Moving length 350mm
Leave distance 300mm
Gyrator
Spindle speed (four gear) (r/min) 115,230,505,1010
Spindle travel(mm) 450
Spindle no-load lifting maximum moving speed(m/s) 0.05
Spindle no load drop maximum movement speed(m/s) 0.067
Spindle maximum feed pressure(KN) 15
Spindle maximum lifting force(KN) 25
Spindle maximum output torque(KN• m) 1.5
Winch assembly
Winch maximum lifting force (single rope) 20
Reel speed (r/min) 20,39,85,170
Reel circumferential speed(m/s) 0.172, 0.345, 0.738, 1.476
Reel diameter(mm) 140
Wire rope diameter(mm) 9.3
Wire rope density (m) 40
Brake diameter(mm) 278
Brake band width (mm) 50
Pump type Horizontal single cylinder double acting
Maximum displacement (motor)(L/min) 95 (77)
The maximum allowable pressure (Mpa) 1.2
Work pressure (Mpa) 0.7
Cylinder diameter (mm) 80
Piston stroke(mm) 100
Oil pump
Oil pump type YBC-20/125
Nominal pressure (Mpa) 12.5
Rated flow(ml/r) 20
Rated speed(r/min) 800-2500
Diesel engine or motor
Diesel engine 1110
Rated power (KW) 16.2
Rated speed (r/min) 2200
Rated pressure(Mpa) 12.5
Motor type Y160M - 4
Rated power (KW) 11
Rated speed (r/min) 1460

GK 200 Engineering Drilling Rig Advantages

(1) It has automatic hydraulic feeding mechanism to improve drilling efficiency and reduce the physical labor intensity of workers.
(2) The ball card clamping mechanism is used instead of the chuck, and the clamping positioning mechanism is provided to implement the non-stop rewinding.
(3) It is equipped with a bottom pressure gauge to indicate the pressure, which is convenient for grasping the inside of the hole.
(4) The handle is concentrated and easy to operate.
(5) Compact structure, the rig and the power machine are all installed on the same base, occupying a small area.
(6) Light weight, high decomposability, easy to relocate, suitable for work in plain or mountainous areas.
(7) It is equipped with a safety shield, which highlights the humanized design features of the equipment.
(8) The fixing nut is installed at the joint between the lower end of the feed cylinder and the vertical shaft box, which improves the reliability of the drilling rig.

Drilling Attentions Before Reaching the Sand Layer

First , mix a pool of mud for standby in advance and replace it in time before reaching the sand layer. When the bit passes through the sand layer, the mud will paste the sand,how do you like this method?

GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth

GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth

GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth

GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth

Inquiry Cart 0