Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD Drilling Rig / Drill Rod / Drill Bit / Track Transporter / Drilling Mud Pump

Manufacturer from China
Verified Supplier
7 Years
Home / Products / Engineering Drilling Rig /

Wheels Mounted Gk 200 Engineering Drilling Rig Mobile Equipment Diesel Power

Contact Now
Jinzhou City Shitan Machinery Equipment CO. LTD.
Visit Website
City:jinzhou
Province/State:hebei
Country/Region:china
Contact Person:MsAnna
Contact Now

Wheels Mounted Gk 200 Engineering Drilling Rig Mobile Equipment Diesel Power

Ask Latest Price
Video Channel
Brand Name :ShiTan
Model Number :GK 200
Certification :ISO9001
Place of Origin :China
MOQ :1 set
Price :Negotiation
Payment Terms :T/T, Western Union
Supply Ability :2000 sets per year
Delivery Time :Within 7 days
Packaging Details :Wooden box
Product Name :Wheels Mounted GK 200 Mobile Easy Operation Engineering Drilling Rig Equipment
Color :Red Yellow blue
Feature :High Drilling Efficiency
Usage :Water Well,exploration
Application :Water Well drilling
Power Type :Diesel
Drilling depth :200 meters
Warranty :1 Year
Voltage :220V/380V
Length of drill pipe(mm) :3m
Condition :New
Depths :200 meters
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Wheels Mounted GK 200 Mobile Easy Operation Engineering Drilling Rig Equipment

GK 200 Engineering Drilling Rig Introduction

The drilling rig is applicable to the engineering geological survey of industrial and civil construction, railway, hydropower, transportation, bridge, dam foundation and other buildings; Geological core drilling and physical investigation; Drilling of small grouting holes, geothermal holes, blasting holes and various concrete detection holes; Small water well drilling and small foundation pile hole.

GK 200 Engineering Drilling Rig Tech Information

Drilling depth
200m
Maximum open hole caliber 300mm
End hole caliber 75mm
Drill rod caliber 60mm
Drilling angle 90°~75°
Drill weight (No include power) 975kg
Unity machine dimensions 1433×697×1273m
Spindle
spindle speed 64 128 287 557r/min
Spindle stroke 450mm
Winch
Max.single line hoisting capacity 2400kg
Single line lifting speed 0.41,0.82,1.64m/s
steel wire rope caliber 13m(35m)
Mud pump
Type Horizontal single urn twin-action
Displacement
170/150L/min(diesel or electromotor)
Diesle engine ZS1115 16.2kw 2200r/min
Electric motor Y160M—4 11kw 1440r/min

GK 200 Engineering Drilling Rig Advantages

1) It has a hydraulic feeding structure to improve the drilling efficiency and reduce the labor intensity of workers.

(2) The drilling rig is equipped with upper ball clamp clamping mechanism and hexagonal active drill pipe, which can reverse the rod without shutdown and is easy to operate.

(3) It is equipped with a hole bottom pressure gauge to indicate the pressure, which is convenient to master the situation in the hole.

(4) The handle is centralized and easy to operate.

(5) The base is equipped with an oil cylinder, which can move back and forth for easy lifting and lowering of drilling tools

(6) The drilling rig has the advantages of compact structure, small volume, light weight, strong decomposition and easy relocation. The loading form is trailer type, crawler type and disassembly. It is suitable for working in plain or mountainous areas.

What is the best time to do soil sampling?

Soil samples can be taken any time throughout the year. It is important though to sample approximately the same time of the year. Late summer, or early fall, is a good time for most crops. This allows time for lime recommended to react and change the pH before the crop is planted

The specific steps of soil sampling method are as follows:

1. Distribution: samples shall be taken according to the soil type and the distribution of crop varieties, and according to the different soil fertility. The sampling points are distributed in zigzag or snake shape, which should be as uniform and random as possible.

2. Determine the sampling position and depth: the sampling position and depth shall be determined according to the thickness of the cultivated layer. Generally, the sampling depth is 0-20cm

Soil Sampling Procedure

Divide the field into different homogeneous units based on the visual observation and farmer’s experience.

Remove the surface litter at the sampling spot.

Drive the auger to a plough depth of 15 cm and draw the soil sample.

Collect at least 10 to 15 samples from each sampling unit and place in a bucket or tray.

If auger is not available, make a ‘V’ shaped cut to a depth of 15 cm in the sampling spot using spade.

Remove thick slices of soil from top to bottom of exposed face of the ‘V’ shaped cut and place in a clean container.

Wheels Mounted Gk 200 Engineering Drilling Rig Mobile Equipment Diesel PowerWheels Mounted Gk 200 Engineering Drilling Rig Mobile Equipment Diesel Power

Wheels Mounted Gk 200 Engineering Drilling Rig Mobile Equipment Diesel Power

Wheels Mounted Gk 200 Engineering Drilling Rig Mobile Equipment Diesel Power

Wheels Mounted Gk 200 Engineering Drilling Rig Mobile Equipment Diesel Power






Inquiry Cart 0