Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD Drilling Rig / Drill Rod / Drill Bit / Track Transporter / Drilling Mud Pump

Manufacturer from China
Verified Supplier
7 Years
Home / Products / Crawler Mounted Drill Rig /

Rotary Water Small 200m Crawler Mounted Drill Rig Portable Machine

Contact Now
Jinzhou City Shitan Machinery Equipment CO. LTD.
Visit Website
City:jinzhou
Province/State:hebei
Country/Region:china
Contact Person:MsAnna
Contact Now

Rotary Water Small 200m Crawler Mounted Drill Rig Portable Machine

Ask Latest Price
Video Channel
Brand Name :JINZHOU SHITAN
Model Number :Truck-mounted drilling rig.crawler mounted drilling rig
Certification :ISO
Place of Origin :China
MOQ :1 set
Price :Negotiation
Payment Terms :T/T, Western Union
Supply Ability :2000 sets per year
Delivery Time :7-10 days
Packaging Details :Standard Export Package
Product Name :ST 200 Deep Hole Blasting In Rocky Area For Water Well Pneumatic Drilling Rig Equipment
Machine Type :Drilling Equipment
Hole Diameter :Customized
Drilling Depths :200 meters
Condition :New
Weight :8.9 T
Warranty :12 months
Rotation torque :7500Nm, 983 N.m, 4200N.m, 3400mm
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Crawler Mounted Rotary Water Small Drilling Rigs Portable Machine For Sale

ST 200 Pneumatic Drilling Rig Introduction

ST 200 Pneumatic Drilling Rig Series Well Drilling Rig is a light, efficient and versatile drilling equipment powered by diesel engine which is from China famous brand. It is mainly suitable for drilling wells, agricultural irrigation wells and other uses, especially for water extraction in mountainous and rock formations engineering.

ST 200 Pneumatic Drilling Rig Technical Parameter

Model ST 200
Condition New
Type Water Well Drilling Rig
Power Type Diesel
Place of Origin China
Brand Name Shitan
Usage Ore
Dimension(L*W*H) 6400MM*2250MM*2700MM
Weight 5800KG
Certification
ISO9000
Warranty 1 YEARS
Marketing Type New Product 2020
Drilling diameter 90-152mm
Depth 25M
Rotary speed 0-90rpm
DTH K40
Drilling Rods 76*2m+76*3m
Air consumption 13-20m3/min
Travelling 0-2.5km/h

projects in rock formations in mountainous areas.

1. Large drilling diameter, deep drilling, fast footage, flexible and efficient.
It is equipped with high-torque hydraulic motor and large-bore hydraulic cylinder for propulsion, and the pump set design is
convenient for maintenance.
2. The drilling rig adopts the excavator crawler chassis, which has strong off-road capability,
independent modular design, and superior maneuverability.
3. The combined positioner can be adjusted and replaced according to different types of drill rods and impactors to ensure
accurate positioning and centering.
4. The chassis comes with four high-strength hydraulic high outriggers, which have strong
bearing capacity and the support height of the outriggers can reach 1.5 meters. The loading and unloading truck can reduce the
cost of hoisting and can be used as a leveling and stable drilling rig during work. 5. The hoisting mechanism facilitates the
lifting of drilling tools, reduces the labor intensity of the operator, and saves time and effort

Measures taken during the running in period of water well drilling rig.


1. Pay attention to the working load during the running in period. Generally, the working load during the running in period should not exceed 80% of the rated working load, and appropriate workload should be arranged to prevent overheating caused by long-term continuous operation of the machine.
2. Observe the indication of each instrument frequently. If there is any abnormality, stop the machine in time to eliminate it
3. Pay attention to strengthen the lubrication of each lubricating point. It is recommended that during the running in period, each shift should add lubricating grease to the lubricating point (except for special requirements).
4. Keep the machine clean and adjust and fasten the loose parts in time.
5. At the end of the running in period, the machine shall be compulsorily maintained, inspected and adjusted, and the oil shall be replaced.
In a word, the requirements for the use and maintenance of water well drilling rigs during the running in period can be summarized as: reduce the load, pay attention to inspection, and strengthen lubrication. As long as attention is paid to and maintenance of construction machinery during the running in period is carried out as required, the occurrence of early failures will be reduced, the service life will be extended, the operation efficiency will be improved, and more economic benefits will be brought to you.

Rotary Water Small 200m Crawler Mounted Drill Rig Portable MachineRotary Water Small 200m Crawler Mounted Drill Rig Portable MachineRotary Water Small 200m Crawler Mounted Drill Rig Portable MachineRotary Water Small 200m Crawler Mounted Drill Rig Portable MachineRotary Water Small 200m Crawler Mounted Drill Rig Portable Machine

Rotary Water Small 200m Crawler Mounted Drill Rig Portable MachineRotary Water Small 200m Crawler Mounted Drill Rig Portable Machine

Inquiry Cart 0