Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD Drilling Rig / Drill Rod / Drill Bit / Track Transporter / Drilling Mud Pump

Manufacturer from China
Verified Supplier
7 Years
Home / Products / Geological Drilling Rig Machine /

Diesel Engine Geological Drilling Rig Machine 22HP Crawler Mounted

Contact Now
Jinzhou City Shitan Machinery Equipment CO. LTD.
Visit Website
City:jinzhou
Province/State:hebei
Country/Region:china
Contact Person:MsAnna
Contact Now

Diesel Engine Geological Drilling Rig Machine 22HP Crawler Mounted

Ask Latest Price
Video Channel
Brand Name :ShiTan
Model Number :GK 200
Certification :ISO9001
Place of Origin :China
MOQ :1 set
Price :Negotiation
Payment Terms :T/T, Western Union
Supply Ability :2000 sets per year
Delivery Time :Within 7 days
Packaging Details :Wooden box
Product Name :Diesel Engine 22 HP Crawler Mounted GK 200 Geological Drilling Rig Machine Equipment
Color :Red Yellow blue
Feature :High Drilling Efficiency
Usage :Water Well,exploration
Application :Water Well drilling
Power Type :Diesel
Drilling depth :200 meters
Warranty :1 Year
Voltage :220V/380V
Length of drill pipe(mm) :3m
Condition :New
Depths :200 meters
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Diesel Engine 22 HP Crawler Mounted GK 200 Geological Drilling Rig Machine Equipment

GK 200 Geological Drilling Rig Introduction

The drilling rig is applicable to the engineering geological survey of industrial and civil construction, railway, hydropower, transportation, bridge, dam foundation and other buildings; Geological core drilling and physical investigation; Drilling of small grouting holes, geothermal holes, blasting holes and various concrete detection holes; Small water well drilling and small foundation pile hole.

GK 200 Geological Drilling Rig Tech Information

Drilling depth
200m
Maximum open hole caliber 300mm
End hole caliber 75mm
Drill rod caliber 60mm
Drilling angle 90°~75°
Drill weight (No include power) 975kg
Unity machine dimensions 1433×697×1273m
Spindle
spindle speed 64 128 287 557r/min
Spindle stroke 450mm
Winch
Max.single line hoisting capacity 2400kg
Single line lifting speed 0.41,0.82,1.64m/s
steel wire rope caliber 13m(35m)
Mud pump
Type Horizontal single urn twin-action
Displacement
170/150L/min(diesel or electromotor)
Diesle engine ZS1115 16.2kw 2200r/min
Electric motor Y160M—4 11kw 1440r/min

GK 200 Geological Drilling Rig Advantages

1) It has a hydraulic feeding structure to improve the drilling efficiency and reduce the labor intensity of workers.

(2) The drilling rig is equipped with upper ball clamp clamping mechanism and hexagonal active drill pipe, which can reverse the rod without shutdown and is easy to operate.

(3) It is equipped with a hole bottom pressure gauge to indicate the pressure, which is convenient to master the situation in the hole.

(4) The handle is centralized and easy to operate.

(5) The base is equipped with an oil cylinder, which can move back and forth for easy lifting and lowering of drilling tools

(6) The drilling rig has the advantages of compact structure, small volume, light weight, strong decomposition and easy relocation. The loading form is trailer type, crawler type and disassembly. It is suitable for working in plain or mountainous areas.

Precautions for courtyard drilling

1. Consider whether the well depth is reasonable

We should first investigate whether there are cables, sewers and other facilities under the ground, and avoid unnecessary damage.

2. Convenience, health and other issues should be considered.

After drilling the well, find some charcoal and throw it into the well with a bag and press it at the bottom of the well to absorb foreign toxins. After having water, you can put a few small fish down, which is a good way to test the safety of water quality.

3. The well should not be too deep. It should be above the ground and should be blocked with bricks and stones. It is better to have a cover, so as to prevent dirt from falling in, make people feel safer and avoid unnecessary dangers.

Sampling Procedure

Divide the field into different homogeneous units based on the visual observation and farmer’s experience.

Remove the surface litter at the sampling spot.

Drive the auger to a plough depth of 15 cm and draw the soil sample.

Collect at least 10 to 15 samples from each sampling unit and place in a bucket or tray.

If auger is not available, make a ‘V’ shaped cut to a depth of 15 cm in the sampling spot using spade.

Remove thick slices of soil from top to bottom of exposed face of the ‘V’ shaped cut and place in a clean container

.

Diesel Engine Geological Drilling Rig Machine 22HP Crawler MountedDiesel Engine Geological Drilling Rig Machine 22HP Crawler Mounted

Diesel Engine Geological Drilling Rig Machine 22HP Crawler Mounted

Diesel Engine Geological Drilling Rig Machine 22HP Crawler Mounted

Diesel Engine Geological Drilling Rig Machine 22HP Crawler Mounted






Inquiry Cart 0