
Add to Cart
Rocky Blasting Deep Underground Borehole Water Well Drilling Rig With 450 Meters
ST 450 Water Well Drilling Machine Introduction
This rig is mainly used to drilling wells,irrigation wells,ground source heating pump wells and boreholes for other purposes,especially for mountain and rock formation well projects,the drilling depth is 450 meters ,hole-diameter is 105-350 mm ,lifting capacity is 24MT.
ST 450 Water Well Drilling Machine Tech Details
Drilling depth | 450m |
Dia.hole | φ105-305mm |
Advance Length one time | 6.6m |
Working pressure | 1.7-3.3MPa |
Air consumption | 17-35m³/min |
Length of rod | 1.5m,2m,3m, (6m can be choosed) |
Dia. Of rod | φ89,φ102,φ114 |
Lifting power | 24T |
Rotation torque | 6200-8500 N.m |
Rotation Speed | 55-115r/min |
Diesel Engine | Yuchai |
Engine Power | 85Kw/2200rpm |
Travelling speed | 0-2.5 Km/h |
Climb capacity | 30° |
Weight | 9000kgs |
Dimension | 5500x1900x2780mm |
Application | Complicated geological conditions: Rock, Mud, Sand etc. |
Drilling Way | Top drive hydraulic rotary and propulsion, Dth Drilling or Mud Pump Driling |
DTH Hammer | 4",5",6",8",10" Drill hammer or CIR110, 130, 150,170 |
ST 450 Water Well Drilling Machine Advantages
The design of composite boom is safe and stable. The operation is simple and fast. It is specially used to drill wells in rock layers, more than 30 meters an hour. The drilling rig is of excellent quality and has a comprehensive after-sales support team to solve customers' worries.
Crawler drilling machine has the advantages of low gravity center of the whole vehicle, stable and safe climbing, strong adaptability, large rotating torque, stable and fast propulsion and lifting, centralized control of the operating handle of the control wheel, simple operation, and improved the operation safety factor.
What can we do fo ryou?
1. different models used for water well drill rig,mine blast hole drill,underground drill project,,etc
2. T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
3. Generally, it will take 7 -10 working days after receiving your advance payment.
The specific delivery time depends on the items and the quantity of your order.
4. Our main machine enjoys a 1 year warranty(except for the hammer), during this time all accessories
broken can be changed for a new one.And we provide videos for machine install and operation.
5. Packing Details : The drilling rig will be packed into wooden box while drill pipes will be packed into bundles or as customer's requirements.
6. Delivery Details : Usual loading port is Tianjin port
Drilling Rig Working Attention
1. Before each shift, grease the drill pipe elevator (wire rope connector);
Note: When filling grease nipple at one end of the elevator, be sure to unscrew the grease nipple at the other end. This will help to squeeze out the butter that was previously injected. On the contrary, the oil seal in the elevator may be crushed, and dirty water containing fine sand and mud can easily enter, which will wear the bearing and reduce the sensitivity of the elevator.
Note: For the improved new elevator, please consult SANY User Service Department for maintenance method.
2. Before each shift, grease the bearing of the follow-up guide frame (upper support of drill pipe) of the drill pipe;
3. Frequently check whether the wire rope is in good condition;
4. Frequently check the damage of oil pipes and sealing rings, and prepare spare parts for urgent needs;
5. Pay attention to whether the circuit relay is aging at any time, and prepare spare parts as soon as possible;
6. Check whether the bearing of drill pipe elevator (wire rope connector) rotates flexibly, and replace it immediately if it is damaged;
7. Frequently check whether the bolts and pin shafts are worn or broken, and replace them immediately if they are damaged.
Replacement of oil filter element:
1. Unscrew and discard the oil filter.
2. Clean the filter shell by self suction and dredge the front and rear differential pressure through holes.
3. Check whether the differential pressure transmitter is normal.
4. Fill the new filter element with oil and apply a layer of oil on the sealing ring of the filter element.
5. When installing the filter element, screw it until it contacts the sealing gasket, and then manually tighten it by 1 / 3 turn.
6. After startup, check whether there is leakage.
Note: the filter element can be replaced only after the screw machine is stopped and the pressure is released. Be careful of hot oil to prevent scalding.