
Add to Cart
XY-1A Portable Shallow Less Depth Borehole Water Well Drilling Rig Machine
XY-1A Water Well Drilling Rig With 150 Meters Depth
XY-1A Water Well Drilling Rigs Introduction
XY-1A drilling rig is mainly used for geological general investigation and exploration, road and tall buliding foundation exploration, kinds of hole in concrete structure, river levees,earth temperature central air-conditioner,etc.Small drill rig widely used in drilling family wells, drilling industry wells and drilling survey geological sampling, SPT service etc. Drilling dia. will from 50-200mm or larger according to clients requirement.
XY-1A Water Well Drilling Rigs Technicals
Xy -1 A Drilling rig | Drilling hole diameter | mm | 150 |
Drilling depth | m | 150 | |
Drill pipe diameter | mm | 42 | |
Borehole inclination | ° | 90°~75° | |
Rig dimension(L×B×H) | mm | 1640×1030×1440 | |
Drill weight(except engine) | kg | 500 | |
gyroscope | spindle speed(three block) | r/min | 142,285,570 |
spindle travel | mm | 450 | |
max moving speed | m/min | 3 | |
vertical max feed force | KN | 15 | |
vertical max lift | KN | 25 | |
windlass | hoisting capacity(single speed rope) | KN | 10 |
drum speed | r/min | 55,110,220 | |
drum circumferential velocity | m/s | 0.42,0.84,1.68 | |
drum diameter | mm | 145 | |
wire rope diameter | mm | 9.3 | |
rope weight | m | 27 | |
the diameter of the brake | mm | 230 | |
brake band width | mm | 50 | |
water pump | pump type | horizontal single cylinder double acting | |
max displacement | L/min | 95(77) | |
max allowable pressure | Mpa | 1.2 | |
working pressure | Mpa | 1.2 | |
cylinder diameter | mm | 80 | |
oil pump | pump type | gear pump | |
power | KW | 16.2 | |
rated pressure | Mpa | 12.5 | |
motor type | YBC-12/125 | ||
displacement | L/r | 12 | |
rated speed | r/min | 2000 |
XY-1A Water Well Drilling Rigs Features
1. With hydraulic feeding device, elevated drilling efficiency, reduced labor strength.
2. The rig is equipped with an upper spherical jaw holding mechanism and hexagonal kelly which can be replaced without shutdown, high efficiency, safe and reliable.
3. A hole bottom pressure gauge is mounted indicating the pressure in order to control the status inside the hole.
4. Compact structure, small volume, lightweight, high detachability, easy transportation and suitable for the operations in plains
Site investigation and soil investigation
Site investigation or soil explorations are done for obtaining the information about subsurface conditions at the site of proposed construction. Soil exploration consists of determining the profile of the natural soil deposits at the site, taking the soil samples and determining the engineering properties of soils.
Buckle the lifter into the groove of the variable diameter joint, move the right handle of the winch to take the pad fork, take out the perforated pipe, install the core tube, lift the drilling tool to the top of the borehole, move the left handle of the winch continuously, and lower the drilling tool into the borehole at a uniform speed. When the groove of the variable diameter joint is close to the inlet, use the pad fork to block and remove the lifter.
What aspects should we pay attention to in the drilling process of water well drilling rig
Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.
1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.
2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.
3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.